Client: Client: Elizabeth River Project (ERP)
Approximate Design Cost: $35,000
Project Timeline: 2006-2007
Design Engineer: Scott C. Blossom P.E.
While with WEG, Scott provided detailed site assessments, concepts and detailed designs as engineer of record for storm water retrofitting in this industrial shipyard setting. While working on the project, Scott met with shipyard staff on multiple occasions (10+) and conducted site surveys as well as coordination during construction (completed by Emerald). The site is a highlight of practical stormwater measures that can be implemented while allowing everyday mission critical activities to continue. The stormwater measures improve stability of the area and increase its value.